陈波. 预应力方钢管混凝土柱非线性规划的最优解[J]. 力学与实践, 2008, 30(5): 28-31. DOI: 10.6052/1000-0992-2007-391
引用本文: 陈波. 预应力方钢管混凝土柱非线性规划的最优解[J]. 力学与实践, 2008, 30(5): 28-31. DOI: 10.6052/1000-0992-2007-391
OPTIMAL SOLUTION OF NONLINEAR PROGRAMMING PROBLEM FOR PRE-STRESSED CONCRETE FILLED STEEL TUBULAR COLUMN[J]. MECHANICS IN ENGINEERING, 2008, 30(5): 28-31. DOI: 10.6052/1000-0992-2007-391
Citation: OPTIMAL SOLUTION OF NONLINEAR PROGRAMMING PROBLEM FOR PRE-STRESSED CONCRETE FILLED STEEL TUBULAR COLUMN[J]. MECHANICS IN ENGINEERING, 2008, 30(5): 28-31. DOI: 10.6052/1000-0992-2007-391

预应力方钢管混凝土柱非线性规划的最优解

OPTIMAL SOLUTION OF NONLINEAR PROGRAMMING PROBLEM FOR PRE-STRESSED CONCRETE FILLED STEEL TUBULAR COLUMN

  • 摘要: 将双优化设计变量转化为单优化设计变量,从而建立起预应力方钢管混凝土柱的优化设计数学模型. 利用罚函数外点法导出了优化设计变量的迭代计算公式,并给出了获得最优解的二重迭代法计算步骤. 算例结果分析表明,本法对解决预应力方钢管混凝土柱截面优化问题,具有概念简单,计算方便的特点,并为此类非线性规划问题提供了较好的求解途径.

     

    Abstract: Double optimal design variables are reduced into asingle optimal design variable, and the optimization design model ofpre-stressed concrete filled square steel tubular column is establishedaccordingly. By using penalty function method, the iteration formulas ofoptimal design variables are derived, and the calculation procedure of thedouble iterative method is given in this paper. The numerical example showsthat it is simple in concept and convenient for solvingcross-section optimization design problems of pre-stressed square steel pipe concretecolumns, and it provides a better approach for nonlinear programming.

     

/

返回文章
返回