初弯曲纵横弯曲梁的等效载荷法及其应用

EQUIVALENT LOADING METHOD FOR SOLVING BEAM-COLUMN WITH INITIAL BENDING AND ITS APPLICATION IN DRILLING ENGINEERING

  • 摘要: 介绍一种求解初弯曲纵横弯曲梁的方法------等效载荷法,以及该方法在解决实际工程问题中的成功应用,为井下控制工具的研制和井眼轨道控制提供了理论依据.

     

    Abstract: The mechanical analysis of bottom hole assembly(BHA) isthe basis of BHA's design and well-path control in oil and gas drillingengineering. ``Beam-column theory'' is a typical and effective method inpractice, but its application is limited for not solving the initialbending problems. A method, as known as equivalent loading method, for solvingbeam-column with initial bending is discussed in this paper. The method hasbeen used successfully for solving practical problems in drillingengineering and provides theoretical foundations for downhole tool design andwell-path control. Conclusions are given in this paper.

     

/

返回文章
返回