喀斯特山地城市大断面地铁车站暗挖施工模板支撑力学分析——以贵阳轨道交通3号线黔灵山公园站为例

Mechanical Analysis of Formwork Support in Underground Excavation Construction of Large Section Metro Stations in Karst Mountain Cities: a Case of Qianlingshan Park Station in Guiyang Metro Line 3

  • 摘要: 为解决在多岩溶、多断层的喀斯特地质条件下,大断面地铁车站暗挖施工面临的模板支撑稳定性问题,本文以贵阳轨道交通3号线黔灵山公园站为例,提出结合台车浇筑、盘扣式模板支架施工的支撑体系,给出了其施工方案,并分析了模板支架的受力特性以及安全保证措施。该工程的顺利实施表明该模板支撑技术体系有效抑制了喀斯特地质中大跨地下工程施工致灾风险,达到了安全、高质、高效的施工效果,可供类似工程参考。

     

    Abstract: To address the formwork support stability challenges encountered during the underground excavation of large-section metro stations in karst geological conditions characterized by multiple karst caves and faults, this paper takes Qianlingshan Park Station of Guiyang Metro Line 3 as a case study. A novel support system integrating trolley-based concrete casting and disk-lock formwork scaffolding is proposed. The construction scheme of this system is detailed, and its mechanical characteristics, including stress distribution in both the trolley formwork and scaffolding structure, are analyzed alongside safety assurance measures. The successful implementation of this project demonstrates that the proposed technical system effectively mitigates disaster risks in large-span underground engineering within karst geology. It achieves safe, high-quality, and efficient construction outcomes, providing a valuable reference for similar engineering projects in comparable geological environments.

     

/

返回文章
返回