阎铁, 龙安厚, 毕雪亮. 取换套修井管柱防卡力学分析与计算[J]. 力学与实践, 2004, 26(4). DOI: 10.6052/1000-0992-2003-168
引用本文: 阎铁, 龙安厚, 毕雪亮. 取换套修井管柱防卡力学分析与计算[J]. 力学与实践, 2004, 26(4). DOI: 10.6052/1000-0992-2003-168
THE MECHANICAL ANALYSIS ON PREVENTING MILLED SLEEVE FROM STICKING IN REPAIRING WELL[J]. MECHANICS IN ENGINEERING, 2004, 26(4). DOI: 10.6052/1000-0992-2003-168
Citation: THE MECHANICAL ANALYSIS ON PREVENTING MILLED SLEEVE FROM STICKING IN REPAIRING WELL[J]. MECHANICS IN ENGINEERING, 2004, 26(4). DOI: 10.6052/1000-0992-2003-168

取换套修井管柱防卡力学分析与计算

THE MECHANICAL ANALYSIS ON PREVENTING MILLED SLEEVE FROM STICKING IN REPAIRING WELL

  • 摘要: 通过取换套修井中套铣管柱的力学分析,建立了考虑压差和粘吸作用下套铣管柱的防卡力学模型. 依此计算了管柱在不同井深下防卡的最长静止时间,并分析了影响管柱阻卡的主要因素.

     

    Abstract: The well repairing by drawing casing and changingis a new technology for restoring a well of casing failure and is veryeffective. During the well repairing, the diameter of themilled sleeve is large and the clearance is small, so that thesticking of the milled sleeve becomes very serious. It often increases therepairing period and repairing cost. In this paper, thetheoretical model of preventing milled sleeve from sticking is establishedby a mechanical analysis. It takes account of bothpressure difference and sticking effect on the milled sleeve. On the basisof the model, the longest time for the milled sleeve stopped in the well iscalculated, so that it can be prevented from sticking. The main factorsof sticking milled sleeve are analyzed.

     

/

返回文章
返回